News

Related Site
  • Burn and Recycle

plate_top.jpg

2016/07/11
Received an Order for Construction of Waste Incineration Plant in Singapore
Plantec Inc. has received an order for construction of waste incineration plant from TECHNOCHEM ENVIRONMENTAL COMPLEX PTE. LTD. (headquartered in Tuas, Singapore, President: Mr. Akio Yoshinari), a subsidiary in Singapore of DOWA ECO-SYSTEM CO., LTD. specialized in environmental and recycling business in Japan as well as overseas.

The incineration plant ordered is for treatment of toxic industrial waste. In this plant, Vertical Combustor (incinerator) and Turbo Chemical Baghouse (flue gas treatment) originally developed by Plantec Inc. were utilized. The throughput capacity of the incineration plant is 36 tons/24 hours x 1 unit.

In this construction project, Plantec Inc. is planning to source majority of the equipment except for those core parts from India-based “Plantec GB Engineering Pvt. Ltd.” (Chennai, India), a Joint Venture Company formed in April 2014 by Plantec Inc. and G.B. Engineering Enterprises Pvt. Ltd., a boiler manufacturer (Tiruchirappalli, India). The construction work has been already commenced and is scheduled to be complete in February 2017.

Outline of the Construction Project
- Ordered by: TECHNOCHEM ENVIRONMENTAL COMPLEX PTE. LTD.
- Project Title: TEC New Incinerator
- Site Location: Tuas, Singapore
- Plant Capacity: 36 tons/24 hours x 1 unit
- Waste Type: Toxic Industrial Waste
- Incinerator: Vertical Combustor
- Dust Collector: Turbo Chemical Baghouse (dry-type chemical reaction bag filter)
- Design & Build: Plantec Inc.
- Construction Period: June 2016 – February 2017

plate_bottom.jpg